🟢 LIVE on the door

đź”” Doorbell test is on the opening checklist

Test both doorbells (manager + every director on shift must ring) Ring each doorbell once. The manager’s phone AND every other director on shift must ring (Lorex Home). A phone that stays silent is fixed before open, and who was missing goes in the notes.
Required · General section, after “Welcome mats out” · id gn-doorbells
Open the staff checklist PR #258 Fly deploy run

đź§ľ Evidence