an isolated-ground (IG) receptacle. Its ground pin is insulated from the box and was designed to run on its own green wire back to a ground bus. These feed the audio gear.
Catapult:
a Radial Catapult, a passive box that carries mic signals over Cat6 cable. Here it splits each mic between two mixing desks.
GX:
an Allen & Heath GX4816, the input box for the live-room desk.
Trident:
the recording console in the mixing room.
Phantom power:
48 V DC a desk sends down a mic cable.
Labels:
Fact seen or measured and written down. Secondhand someone reported it. Inference our reading of the facts. Unknown nobody has checked.
Ref numbers:
staff text and file references, so any claim can be checked. Ask Taji for the original.
The seven items to quote
Price each one separately. Write "no charge" or "not needed" where that is the answer.
1
Write the panel schedule for every panel
Done means
A typed directory card in every panel listed under Site facts: breaker number, poles, rating, and what it serves. Plus which meter feeds each panel. A photo of each card with the dead front on, emailed to Taji and Greg.
We hand you
Fact Eight panels named in staff records, nine if the outdoor panel rewired in 2025 is not the Square D. Two SCE meters. Names: Zinsco main, A, B, C, Cutler-Hammer Console, Square D, RodCo sub, roof HVAC, outdoor.Electrical history lines 108, 123 to 131
Fact The panel register, one record per panel, ready for your numbers. Open it.Register, panels.json
Fact 238 devices placed from the 1995 and 2012 drawings, none with a breaker number yet.devices.json
Your price
2
Measure the orange-outlet ground path to the service ground
Done means
A written yes or no: does a ground path exist from the orange outlets to the service grounding electrode? Readings per outlet with its circuit number. If the path is broken, where it breaks and the price to bond it.
We hand you
Fact 22 orange outlets on the drawings.devices.json
Fact Every orange outlet tested reads "open ground" on a plug-in tester. Neutral to ground floats 30 to 60 V and drifts. Hot to neutral is a solid 121 V.Electrical history lines 45, 83 to 88 (Klein RT210 and AstroAI AM33D, 8/3/26; live room 1/22/26)
Fact No ground impedance or continuity reading has ever been taken.Electrical history line 88
Fact The 1995 design calls for 5 ft copper rods in each machine room, a copper bus, and #2 in 3/4 in conduit to the electrical room "for future connection".Electrical history line 35 (Sheet A-5.1)
Fact The two outdoor rods photographed have clamps and no conductor. Inference The technical ground may never have been connected.Electrical history line 132
Safeguard
An open ground means no fault-clearing path at the outlet. Treat every orange outlet as a shock risk until you have measured it.
Your price
3
One written finding on the buzz
Done means
One page that squares the earlier visit with the measured float: what you measured, whether the buzz is a grounding problem, and whether the open grounds need repair regardless.
We hand you
Secondhand After a licensed electrician (Abe) visited on 9/29/26, a staff member texted: "We did figure out the buzz is not coming from a grounding issue". Unknown What he measured.Staff text, ref 943264; Abe named as a licensed electrician in ref 940598
Fact The 30 to 60 V neutral-to-ground float above, measured before that visit.Electrical history lines 83 to 88
Fact Staff text 9/21/26: "Both mixers get clean signals when going direct in, the loop seems to happen when both sides are on". Inference A ground loop between two grounded systems sharing one split.Ref 941340; electrical history line 97
Your price
4
Fix the circuit that trips when it rains
Done means
Price A: find the tripping breaker and the water entry point, label both, report in writing. Price B, quoted after A: repair to wet-location rating with GFCI protection where code requires.
We hand you
Fact 9/6/26: "the rain tripped the breaker". The lounge TV and speakers died. Staff unplugged everything and reset it.Staff text, ref 936762; fault log F-01, F-04
Fact Jon's own words after the reset: "it was working for a while." Inference The fix was temporary.Staff text, ref 936762; fault log F-04
Unknown Which panel and breaker.Not in the fault log or any text
Inference Water reaching a box, conduit or outdoor circuit, or a GFCI doing its job. An overload is unlikely.From fault log F-01, F-04
Safeguard
Rain reaching a live circuit. Until this is fixed, staff should not reset the breaker during rain.
Your price
5
Install the exit signs
Done means
A price per sign: hard-wired, emergency battery pack, installed and tested to code, permit if required. Assume 1 to 4 signs; the per-sign price lets the count change after the survey.
We hand you
Secondhand Staff text 9/3/26: the signs are "wired signs and recommended that they're installed by a licensed electrician."Staff text, ref 936160; fault log F-05
Fact The drawings show one exit sign with an emergency pack, on the exterior alley wall.devices.json, device EX-L03
Unknown How many more signs code requires inside.Not in any drawing or text
Your price
6
Move stage lighting off the audio panel, if they share one
Done means
A written yes or no: does stage lighting share a panel or feeder with the orange outlets? If yes, a price to move the lighting.
We hand you
Secondhand Staff who tested the panel in March 2026 reported "the lights and the audio are on the same panel".Electrical history line 51
Fact The 1995 design kept lighting and HVAC off the technical power panel.Electrical history line 35
Fact The Square D panel carries breakers labeled OUTDOOR and STAGE LIGHTS.Electrical history line 127
Fact On 9/25/26, with all studio lighting off, the buzz dropped but stayed. Lights back on, it rose.Buzz investigation notes, line 15
Your price
7
Line-item quote for the panel repair
Done means
An itemized price for each panel repair you recommend, with the reason for each. A written answer on whether you will work in the Zinsco gear.
We hand you
Secondhand A prior visit on 9/29 produced a verbal estimate for panel repair. Unknown Which panels and what work.Staff text, ref 943264
Fact The 2024 inspection found Zinsco panels and subpanels with missing knockouts.Electrical history line 36
Your price
The quote must include
CSLB license number.
A price per item, numbered 1 to 7 as above.
Permit cost where a permit is needed.
A separate price for the survey visit.
A written answer on working in the Zinsco gear.
Electrician, signature
License #
Date
Site facts
Fact Eight panels named in staff records, nine if the outdoor panel rewired in 2025 is not the Square D. Two SCE meters (electrical history lines 108, 123). No panel schedule, circuit number or outlet-to-breaker map exists for this building. Fact The 1995 and 2012 drawing sets have none (plans review, lines 10, 76, 470 to 485). Each panel name opens its record in the register.
Zinsco main gearFact Labeled 240 V. The 2024 inspection report records "120/240 volts", 200/400 A, and ticks both single-phase and 3-phase. The insurer flagged Zinsco and waived replacement on 8/20/26. Inference Service may be 120/208 V 3-phase; unresolved.Electrical history lines 36, 60, 119 to 122
Panels A, B, CFact Labeled PNL A, B and C. Covers never opened for testing. Other links: B, C.Electrical history line 125 (handoff photo C)
Cutler-Hammer "Console" panelFact Breakers hand-labeled Console #1 to #5 and #6 to #8 "Mechanical Rm", about 16 single-pole 20 A. Unknown Its location in the building is not recorded.Electrical history line 126 (handoff photo D, below)
Square D, OUTDOOR / STAGEFact Breakers labeled OUTDOOR, STAGE LIGHTS and "...CH", one taped "DO NOT TOUCH" in the 2026 insurance photos. Secondhand Another electrician reports a grounding conductor is landed in this subpanel.Electrical history lines 60, 108, 127
RodCo 2024 sub panelFact New sub panel in the electrical room, installed by RodCo in 2024.Electrical history line 131
Roof HVAC panelSecondhand A roof panel serves the rooftop AC units, per the HVAC contractor on 9/9/26.Electrical history line 129
Outdoor panel (2025 rewire)Fact Rewired by the general contractor in November 2025; gym and kitchen outlet circuits got a neutral run back to the panel.Electrical history lines 42, 130
Two SCE metersFact Two SCE meters. Unknown Which panel each meter feeds. Second meter: record.Electrical history line 123 (elijah-electrical-history.md:123)
Panel photo: gated, ask Greg.
Cutler-Hammer "Console" panel, 8/3/26. Location not recorded.
Panel photo: gated, ask Greg.
Main panel, door closed, 8/3/26. Never opened for testing.
Safety summary for the quote
Fact 22 orange outlets appear on the drawings. Every one tested reads open ground. Inference All 22 are open.devices.json; electrical history line 88
Fact Fog-machine fluid is spilling onto the carpet, cables and outlets.Staff text 9/17/26, ref 940421
Fact Breakers had been taped. The insurer required the tape removed; Greg removed it on 9/12/26 and asked for a sign.Ref 938881; electrical history line 60
Fact Staff switch the lighting breaker off at night and back on in the morning. Inference Confirm the breaker is rated for use as a switch (SWD) or quote a proper switch.Refs 938079 to 938081 (9/9/26), 939784 and 939788 (9/15/26)
Fact A light flickering "more aggressive" on 10/5/26. Unknown Which room, and whether it is the lamp or the circuit.Staff text, ref 946032
Fact Exit signs not yet installed. Item 5.Fault log F-05
Fog machine beside a power strip, 9/17/26.Background for item 3: the audio isolation plan (studio tests, not in your quote)
Inference Transformer isolation modules on the mic-closet leg of the Catapult split are recommended in every diagnosis branch, after the ground bond. The buzz investigation lists bonding first, then Radial RX4M modules "if anything remains", as the permanent isolation.Buzz investigation notes, lines 17, 21, 23
Fact The buzz sits on channels 2 and 20. Channels 1 and 16 on the same path are clean.Buzz investigation notes, line 13
Phantom-power test, channels 2 and 20
Turn phantom power off on channels 2 and 20 at the desk. Listen.
Turn phantom power back on. Listen again.
Write down whether the buzz changed. If it drops with phantom off, the noise is getting in through the phantom circuit.
On the capture list
Item 14: neutral-to-ground volts at three orange outlets, lights on and lights off.
Item 15: AC volts between the GX chassis and the Trident chassis.
Item 16: swap Catapult output 2 to output 1 at the GX and listen before and after.